Office cleaning quote and office cleaning quotes: the five things that have to be identical before two of them can be compared

Most buyers collect three office cleaning quotes and discover they cannot be compared. That is not the contractors' fault: each has priced a slightly different building, because the invitation left each of them to assume. Fixing it costs one document and it is the highest-return hour in this whole exercise.

The five things to fix in writing

Cleanable square footage with a marked-up plan, frequency by area rather than building-wide, the periodics and their intervals, whether consumables are in or out, and the access window. Bids priced against those five are comparable; bids priced against a walkthrough alone are five different products.

What to ask for back

A monthly total at the stated frequency, the cleaner-hours per visit behind it, and a separate line for each periodic. The hours figure is the one that tells you what you are really buying, and a contractor who will not write it down has told you something.

Reading the spread

A tight spread means the specification was clear. A wide one means it was not, and the cheapest bid is usually the one that assumed the least. Go back with clarifications rather than choosing, because a second round against a corrected specification costs a week and routinely moves the winner.

Questions people ask about office cleaning quote

How many quotes should I get?

Three is the common answer and it is about comparability rather than price.

Should I share my budget?

Sharing a range tends to narrow the spread and tells you less. Sharing the specification is what actually produces comparable bids.

How long should a quote take?

A walkthrough and a few days is normal for a single building. Same-day numbers are being estimated from area alone.

Can I use a quote to renegotiate my current contract?

Yes, and it is the most common reason buyers run this process. A comparable bid is a much stronger position than a request.

Do contractors expect to be beaten on price?

They expect to be compared. A well-specified process usually settles on scope rather than on the lowest number.